Building
High-rise MEP (≤30 Floors)
Mechanical, Electrical, Plumbing
Design and integration of MEP for buildings up to 30 floors. Includes HVAC, lifts, fire protection, and plumbing systems.
⏱ 5 days
📊 Intermediate
🏫 Offline / In-house
Full Description
Comprehensive MEP design training: load calculation, duct sizing, electrical distribution, plumbing systems, and coordination with architecture. Focus on real high-rise project case studies.
Duration5 days
LevelIntermediate
CategoryBuilding
MEPHigh-riseHVAC
Learning Impact
Learning Outcomes
✓
Calculate HVAC loads and select appropriate cooling systems✓
Design electrical distribution and building grounding systems✓
Design plumbing systems: domestic water, wastewater, and drainage✓
Integrate MEP systems with architectural design✓
Prepare tender documents and MEP shop drawingsCurriculum Structure
Curriculum
1
Mechanical Systems (HVAC)
- Cooling load calculation (CLTD/TETD method)
- AHU, FCU, and chiller plant systems
- Duct sizing and air distribution
2
Electrical Systems
- Power distribution: transformers, panels, cables
- Lighting design and emergency power
- Grounding, lightning protection, and fire alarm
3
Plumbing & Fire Protection
- Domestic water distribution and pump sizing
- Drainage systems and wastewater treatment
- Sprinklers, hydrants, and fire protection systems
Recommended Participants
Target Audience
Building MEP engineers
M&E contractors
Building design consultants
Construction project quantity surveyors
Training Support
Facilities
Technical modules & sample shop drawings
AutoCAD MEP trial software
Competency certificate
Lunch & coffee breaks
Industrial Training Partnership
Ready to Upgrade Your Team's Competency?
Contact us for schedules and special offers for your company.