Building

High-rise MEP (≤30 Floors)

Mechanical, Electrical, Plumbing

Design and integration of MEP for buildings up to 30 floors. Includes HVAC, lifts, fire protection, and plumbing systems.

5 days
📊 Intermediate
🏫 Offline / In-house

Full Description

Comprehensive MEP design training: load calculation, duct sizing, electrical distribution, plumbing systems, and coordination with architecture. Focus on real high-rise project case studies.

Duration5 days
LevelIntermediate
CategoryBuilding
MEPHigh-riseHVAC

Learning Impact

Learning Outcomes

Calculate HVAC loads and select appropriate cooling systems
Design electrical distribution and building grounding systems
Design plumbing systems: domestic water, wastewater, and drainage
Integrate MEP systems with architectural design
Prepare tender documents and MEP shop drawings

Curriculum Structure

Curriculum

1

Mechanical Systems (HVAC)

  • Cooling load calculation (CLTD/TETD method)
  • AHU, FCU, and chiller plant systems
  • Duct sizing and air distribution
2

Electrical Systems

  • Power distribution: transformers, panels, cables
  • Lighting design and emergency power
  • Grounding, lightning protection, and fire alarm
3

Plumbing & Fire Protection

  • Domestic water distribution and pump sizing
  • Drainage systems and wastewater treatment
  • Sprinklers, hydrants, and fire protection systems

Recommended Participants

Target Audience

Building MEP engineers
M&E contractors
Building design consultants
Construction project quantity surveyors

Training Support

Facilities

Technical modules & sample shop drawings
AutoCAD MEP trial software
Competency certificate
Lunch & coffee breaks

Industrial Training Partnership

Ready to Upgrade Your Team's Competency?

Contact us for schedules and special offers for your company.

💬 Ada yang ingin ditanyakan?